Situation: A tornado ripped through Brooke Brandon's home in 2023, and TXM Rebuild is approaching the final stage of the rebuilding effort.
Urgency: Final workdays are May 19-20. Workday begins at 8 a.m. and finishes at 3:30 p.m. each day.
Scope of Work: Installation of flooring (about 650 square feet of laminate floating floor), two storm doors, two ceiling fans and an interior door, plus finishing trimming along baseboards and casing. We could use a variety of skills and determination to work on details. Some paint touch-up is inevitable. Bring some tools if you have an idea of what matches the punch list, but you can count on us having a Rebuild trailer with tools.
Team Need: Seven people max per day. Join in for one day or both. Drive in on the same day and return home late evening or tell us you need a cot for lodging the days on the project site. Lunch provided. Dinner plans in place for anyone staying overnight.
Special Skills Needed: No special skills needed other than willingness to work and care.
Sign Up: Complete the form below and check the Matador home project.